Transmission in 'Blue Battery'


The capacity of the Norwegian transmission grid will increase substantially and the internal bottlenecks in the system will be eliminated to make full use of all geographically dispersed hydropower potential.

The interconnection capacity between Norway and countries around the North Sea will have to reach 42-69 GW, as estimated by the report presented by the German Advisory Council on the Environment.

Logo SINTEF Logo NINA Logo NTNU